Crane Fleet from 25 to 770 tons

General Construction Crane Services
Coordinated With Your Site Schedule

We handle crane work for general contractors and construction managers across the Northeast. From multi-pick days on commercial sites to single critical-pick days on tight schedules, we plan around your trade sequencing, your site logistics, and your project closeout. Operators who have run construction lifts many times before, and the fleet to size the crane to the work.

Operated Crane Service | Rigging | Hauling & Storage
Operated crane with extended boom at downtown building lift

Compliant with industry standards.

Construction Lift Services

Crane Rentals For General Construction Projects

Construction lifts run on a project schedule that connects every trade. We plan the crane day around your structural steel sequence, your mechanical install windows, your roofing crew, and the staging space you can dedicate. The lift fits the schedule, not the other way around.

Multi-pick days for steel, mechanical, and equipment placements.

Tower crane and equipment lifts on commercial buildings.

Tight-site staging coordinated with adjacent trades and tenants.

Aerial view of Aero Crane working a commercial site in Lowell
Aero Crane crew coordinating load at downtown building site

Our Experience With Construction Projects

We have run construction lifts across the Northeast for decades. Multi-pick days on commercial buildings, structural steel sequencing, mechanical equipment placements on schedule. The patterns repeat, and our planning process is built around them. Operators arrive with the day already mapped out.

Services

Operated crane, rigging, hauling, and storage all run through one Aero team. The crew that books the lift also handles the rig plan, the transport, and the staging.

Areas We Serve

Aero crews dispatch from South Windsor across Connecticut, Rhode Island, western Massachusetts, and southern Vermont. Equipment is matched to the site distance, road access, and lift requirements before the crane leaves the yard.

Fleet Capacity

The fleet spans 25-ton carry decks to 770-ton all-terrain Liebherrs, with boom trucks, truck cranes, and forklifts in between. Each crane is matched to the load, the site access, and the schedule of your job.

Process

How We Execute Construction Crane Work

For construction crane work, we align early with your project team to confirm the pick schedule, the trade sequencing, and the staging space available. Then we plan the rigging, coordinate with your superintendent, and execute the lifts on the day you scheduled.

Confirm Pick List And Schedule

We confirm the pick list, the load weights, the lift radii, the staging space, and the trade sequence the day has to fit into.

Match The Right Crane And Setup

We size the crane to the longest reach and heaviest pick of the day, plus the staging space the site has. Boom truck for short-duration multi-stop work, All-Terrain for the heavy and high picks.

Coordinate With Trades And Site

We sequence the lifts around your other trades, the site logistics, and any street or sidewalk closures needed. Pre-lift call covers radio communication and pick order.

Execute And Close Out

On the day of, we run the pre-lift checklist, hit each pick on schedule, and clear the staging area. Demobilization is timed to release the site to the next trade or the close of the day.

Tell Us About Your Next Lift Day

Send the pick list, the trade sequence, and the staging plan. We will match the crane to the work and lock in the day.

Aero Crane outrigger setup at Lowell commercial building site

Construction Crane Service FAQs

Questions general contractors and construction managers ask before booking a lift.

What Construction Work Do You Lift?

Structural steel, precast, mechanical equipment, rooftop units, generators, façade panels, formwork, equipment placements between trades, and multi-pick coordination days. We size the crane to the heaviest and farthest pick of the day.

Can You Run A Multi-Pick Day?

Yes. We sequence multi-pick days around your trade schedule. The operator stays on site through the picks, and we coordinate with each trade as their lift comes up. The day runs on the plan we built before the truck rolls.

Do You Coordinate With The Superintendent?

Yes. Our operator works with your superintendent on radio communication, pick sequencing, and pause points for other trades. Pre-lift call covers expectations so the day runs without lost time.

What Sizes Of Cranes Do You Use For Construction?

Boom trucks (45 to 55 ton) for quick rooftop and street-level picks. Truck cranes (60 ton) for mid-range commercial work. All-Terrain cranes (110 to 770 ton) for structural steel, high-rise placements, and heavy equipment days. Carry decks for indoor or tight-site work.

How Far In Advance Should I Book A Construction Lift?

1 to 2 weeks of lead time secures most standard pick days. Larger projects with multi-crane needs or street permits benefit from 3 to 4 weeks. We work shorter windows when our schedule allows.

All-In-One

Our Services

We handle every part of the lift workflow: operated crane service, rigging, hauling, and storage. Tell us about your project and we'll match the equipment, plan the setup, and lock in the schedule.

Industrial lift operation at power plant by Aero Crane
Crane Rental

Operated crane service,
planned and dispatched

We bring the crane, the operator, and the lift plan to your site. Every job is mapped at our yard before the equipment ships, so the crew arrives ready to work.

Aero Crane rigging team working an indoor industrial lift
Engineered Rigging

Rigging coordinated
with the lift plan

Our rigging team works alongside the operated crane crew. Slings, shackles, spreader bars, and tag lines are matched to the load before the lift starts.

HVAC units secured on flatbed for transport by Aero Crane
Heavy Transport

Heavy haul
from yard to jobsite

We move equipment, structures, and oversize loads on flatbeds and lowboys across our service area. Routes are planned for permits, clearances, and the schedule of the lift on the other end.

Aero fleet cranes parked inside the garage at South Windsor
Yard Storage

Yard storage
between project phases

When equipment or materials need to wait between phases, our South Windsor yard offers secure storage with re-mobilization built into your schedule.

Our Fleet

Cranes and equipment from 25 to 770 tons

Liebherr 175-ton crane at the Aero South Windsor yard
Inventory

Cranes for
Every Kind of Lift

We run all-terrain cranes from 110 to 770 tons, plus boom trucks, truck cranes, carry decks, and forklifts. Each piece of equipment is inspected, maintained, and sized to your project before it ships from the yard.

All-Terrain Cranes: 110 to 770 tons

Boom Trucks: 45 to 55 tons

Truck Crane: 60 tons

Carry Deck: 25 tons

Contact Us

Get a quote on your next lift

Send us the load, the site, and the date. We'll respond with the right crane, the right schedule, and a planning call to lock it in.

Tell us the load weight, the site address, and the date you need a crane.

We confirm the load, walk the site if needed, and match the right crane to the job.

We lock in the schedule, send the rig plan, and dispatch from the yard.

We received your message and will respond soon
Something went wrong. Please try again.